Office Building Oskar

Munich, Germania
Lobby
Foto © Fantomas

In 2018, A/W redesigned all the public areas at Siemens Headquarters, originally built in 1999 by Richard Meier. The round, 8-metre-high entrance hall now serves as a reception and lobby. The reception desk made of solid Italian Carrara marble and a blue-and-grey-coloured carpet are positioned in the centre of the lobby. Directly above and framed by floor-to-ceiling curtains is a light installation almost 10 metres in diameter with 1,200 stainless-steel interactive LED rods from the design agency Fantomas.

Light Installation
Foto © Fantomas
Reception Desk
Foto © Fantomas
Architetti
Arnold / Werner
Sede
Oskar-von-Miller-Ring 20, 80333 Munich, Germania
Anno
2018
Cliente
Hines
Team
Arnold / Werner Architekten
Signaletics and Light Installation
Fantomas

Progetti collegati 

  • 五樟庭文旅生活馆
    Parallect Design
  • Kindergarten Müllerwis
    Walo Bertschinger AG | Bodenbeläge
  • Lanserhof Sylt
    TROPP LIGHTING DESIGN
  • Feuerwache Zeven
    abj Architekt:innen GmbH
  • Umbau / Sanierung Wohnhäuser in Emmenbrücke
    GKS Architekten AG

Rivista 

Altri progetti di Arnold / Werner 

Hotel Perlach Plaza
München, Perlach, Germania
Haus A/Z
Germania
Wohnung Reitmorstraße
München, Germania
Bungalow Germering
München, Germania
Fantomas Design
München, Germania