Mango Processing Unit

Ratnagiri, Inde

Adaptive use of a self-supporting proprietary roof system eliminates the need for high maintenance structural trusses in the process hall interior.

A passive ventilation system incorporates low 'horizontal' window strips for air intake with helical metal air extractors on the roof driven by natural drafts. This arrangement, along with the shade provided by standing metal roof seams, permits a comfortable work space even during the hot humid summer season.

Separation of 'skin' and 'structure' not only facilitates ventilation of this seemingly windowless building, but also provides a sheltered corridor for running services piping that can be accessed easily even during heavy monsoon rains.

Architectes
Flying Elephant Studio
Lieu
Mirjole Industrial Estate MIDC, Kolhapur Road, 415639 Ratnagiri, Inde
Année
2004
Client
Exotic Fruits Ltd.
Architects
Kiran Chandra, Ceejo Cyriac, Rajesh Renganathan
Structure
Manjunath & Co
MEP
NV Rao, MD Deshmukh
Contractors
Anand Patil

Projets liés 

  • 五樟庭文旅生活馆
    Parallect Design
  • Kindergarten Müllerwis
    Walo Bertschinger AG | Bodenbeläge
  • Lanserhof Sylt
    TROPP LIGHTING DESIGN
  • Feuerwache Zeven
    abj Architekt:innen GmbH
  • Umbau / Sanierung Wohnhäuser in Emmenbrücke
    GKS Architekten AG

Magazine 

Autres projets de Flying Elephant Studio 

GMR - Schulich School of Business
Hyderabad, Inde
APF School and District Institute
Yadgir, Inde
Divya Shanthi Campus
Bangalore, Inde
IIIT-B Student Centre
Bangalore, Inde
Dr. APJ Kalam Science City
Patna, Inde